ITAC Assessment: SF0552
ITAC logo
ITAC Assessment: SF0552
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product In-shell Almonds, Raw Almonds, Almond Oil and Almond Powder
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 100,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 4,480
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,741 1,347,499
kWh
Electricity Demand $125,510 5,628
kW-mo/yr
Natural Gas $4,017 280
MMBtu
Waste Disposal Costs
Water Usage $20,000 1,000
Tgal
TOTAL YEARLY COSTS $289,268
RECOMMENDED SAVINGS* $146,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $111,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $25,284 - - $25,284
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,516 - $4,596
44,324
kWh
- - $(-1,080.0) -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $575 $137 $95
915
kWh
$480
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $896 $400 $896
6,282
kWh
- - - -
05 2.3132: Recharge batteries on during off-peak demand periods $2,065 $1,862 - $2,065
-
kW-mo/yr
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,077 $12,392 $7,225
69,677
kWh
$7,111
-
kW-mo/yr
$(-4,259.0)
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $15,621 $33,085 $6,878
66,034
kWh
$5,712
-
kW-mo/yr
- $739 $2,292
08 2.9114: Use solar heat to make electricty $88,458 $451,750 $58,025
559,550
kWh
$30,433
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $146,492 $499,626 $77,715
746,782
kWh
$71,085
-
kW-mo/yr
$(-4,259.0)
-
MMBtu
$(-341.0) $2,292
TOTAL IMPLEMENTED $111,131 $487,234 $70,490
677,105
kWh
$38,690
-
kW-mo/yr
- $(-341.0) $2,292
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs