ITAC Assessment: SF0535
ITAC logo
ITAC Assessment: SF0535
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Metal Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 10,000
ft2
Annual Production 120,000
units
Production Hrs. Annual 3,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,000 329,310
kWh
Electricity Demand $20,081 1,320
kW-mo/yr
Natural Gas $1,825 141
MMBtu
TOTAL YEARLY COSTS $74,906
RECOMMENDED SAVINGS* $26,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,332

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,145 - $3,465
21,529
kWh
- $(-1,320.0) -
02 2.4231: Reduce the pressure of compressed air to the minimum required $341 $220 $302
1,878
kWh
$39
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,832 $7,129 $2,525
15,650
kWh
$893
-
kW-mo/yr
$442 $(-28.0)
04 2.9114: Use solar heat to make electricty $20,355 $80,550 $17,127
106,420
kWh
$3,228
-
kW-mo/yr
- -
TOTAL RECOMMENDED $26,673 $87,899 $23,419
145,477
kWh
$4,160
-
kW-mo/yr
$(-878.0) $(-28.0)
TOTAL IMPLEMENTED $26,332 $87,679 $23,117
143,599
kWh
$4,121
-
kW-mo/yr
$(-878.0) $(-28.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs