ITAC Assessment: SD0603
ITAC logo
ITAC Assessment: SD0603
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Block and Brick
NAICS 327331: Concrete Block and Brick Manufacturing
SIC 3251: Brick and Structural Clay Tile
Sales Range $50
M
to 100
M
# of Employees 57
Plant Area 104,000
ft2
Annual Production 13,000,000
units
Production Hrs. Annual 4,973
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,244 1,875,630
kWh
Electricity Demand $268,538 6,782
kW-mo/yr
Electricity Fees $37,527 -
TOTAL YEARLY COSTS $523,309
RECOMMENDED SAVINGS* $15,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,364 $5,800 $2,799
24,169
kWh
$2,565
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,309 $3,594 $2,343
20,239
kWh
$1,936
-
kW-mo/yr
$30
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,802 $6,300 $1,811
15,637
kWh
$1,991
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $2,190 $4,000 $1,200
10,371
kWh
$990
-
kW-mo/yr
-
TOTAL RECOMMENDED $15,665 $19,694 $8,153
70,416
kWh
$7,482
-
kW-mo/yr
$30
TOTAL IMPLEMENTED $15,665 $19,694 $8,153
70,416
kWh
$7,482
-
kW-mo/yr
$30
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs