Assessment Year | 2021 |
---|---|
Principal Product | Block and Brick |
NAICS | 327331: Concrete Block and Brick Manufacturing |
SIC | 3251: Brick and Structural Clay Tile |
Sales Range | $50 M to 100M |
# of Employees | 57 |
Plant Area |
104,000
ft2
|
Annual Production | 13,000,000
units
|
Production Hrs. Annual | 4,973
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,244 | 1,875,630 |
kWh
|
$0.12 |
Electricity Demand | $268,538 | 6,782 |
kW-mo/yr
|
$39.59 |
Electricity Fees | $37,527 | - |
|
- |
TOTAL YEARLY COSTS | $523,309 | |||
RECOMMENDED SAVINGS* | $15,665 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,665 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,364 | $5,800 |
$2,799
24,169
kWh
|
$2,565
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,309 | $3,594 |
$2,343
20,239
kWh
|
$1,936
-
kW-mo/yr
|
$30 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,802 | $6,300 |
$1,811
15,637
kWh
|
$1,991
-
kW-mo/yr
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $2,190 | $4,000 |
$1,200
10,371
kWh
|
$990
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $15,665 | $19,694 |
$8,153
70,416
kWh
|
$7,482
-
kW-mo/yr
|
$30 | ||
TOTAL IMPLEMENTED | $15,665 | $19,694 |
$8,153
70,416
kWh
|
$7,482
-
kW-mo/yr
|
$30 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs