ITAC Assessment: SF0533
ITAC logo
ITAC Assessment: SF0533
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $100
M
to 500
M
# of Employees 177
Plant Area 552,017
ft2
Annual Production 12,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $502,026 4,332,924
kWh
Electricity Demand $345,666 11,681
kW-mo/yr
Natural Gas $118,471 15,832
MMBtu
TOTAL YEARLY COSTS $966,163
RECOMMENDED SAVINGS* $173,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $133,624

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $10,552 - - - $10,552
-
MMBtu
- -
02 2.2135: Repair and eliminate steam leaks $5,167 $1,440 $5,167
48,927
kWh
- - - -
03 2.2621: Modify refrigeration system to operate at a lower pressure $39,996 $12,500 $39,996
378,754
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,254 $4,129 $10,712
101,436
kWh
$4,542
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,489 $4,651 $8,770
83,045
kWh
$3,719
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,888 $3,120 $4,191
39,685
kWh
$1,697
-
kW-mo/yr
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $292 $163 $203
1,921
kWh
$89
-
kW-mo/yr
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,088 $25,965 $33,067
191,549
kWh
$3,021
-
kW-mo/yr
- - -
09 2.7224: Reduce space conditioning during non-working hours $2,925 $3,138 $2,925
27,700
kWh
- - - -
10 2.6218: Turn off equipment when not in use $1,765 $2,729 $1,180
11,172
kWh
$585
-
kW-mo/yr
- - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,111 $11,016 $6,111
57,871
kWh
- - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $37,093 $93,629 $24,183
229,007
kWh
$10,299
-
kW-mo/yr
- $2,321 $290
TOTAL RECOMMENDED $173,620 $162,480 $136,505
1,171,067
kWh
$23,952
-
kW-mo/yr
$10,552
-
MMBtu
$2,321 $290
TOTAL IMPLEMENTED $133,624 $149,980 $96,509
792,313
kWh
$23,952
-
kW-mo/yr
$10,552
-
MMBtu
$2,321 $290
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs