ITAC Assessment: SF0527
ITAC logo
ITAC Assessment: SF0527
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Medium Voltage Switches and Brackets
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 110,000
ft2
Annual Production 4,900
units
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,768 443,654
kWh
Natural Gas $4,116 327
MMBtu
TOTAL YEARLY COSTS $91,884
RECOMMENDED SAVINGS* $92,612 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,577 - $4,997
25,261
kWh
- - - $(-420.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $545 $70 $545
2,756
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,584 $27,496 $10,298
52,057
kWh
- $437 - $(-151.0)
04 2.9114: Use solar heat to make electricty $76,906 $341,292 $69,309
438,831
kWh
$6,611
-
kW-mo/yr
- $986 -
TOTAL RECOMMENDED $92,612 $368,858 $85,149
518,905
kWh
$6,611
-
kW-mo/yr
$437 $986 $(-571.0)
TOTAL IMPLEMENTED $15,706 $27,566 $15,840
80,074
kWh
- $437 - $(-571.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs