Assessment Year | 2014 |
---|---|
Principal Product | Size Reduction of Polymers |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 74 |
Plant Area |
127,500
ft2
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $722,161 | 11,248,800 |
kWh
|
$0.064 |
Electricity Demand | $68,983 | 27,063 |
kW-mo/yr
|
$2.55 |
Electricity Fees | $413 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,059 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $766 | $55 |
$715
11,172
kWh
|
$51
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,849 | $1,000 |
$3,650
57,032
kWh
|
$199
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $73,479 | $55,500 |
$69,667
1,088,540
kWh
|
$3,812
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,376 | $1,950 |
$2,376
37,126
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $1,464 | $1,700 |
$1,464
22,860
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,125 | $4,000 |
$503
7,862
kWh
|
$55
-
kW-mo/yr
|
$567 | |
TOTAL RECOMMENDED | $83,059 | $64,205 |
$78,375
1,224,592
kWh
|
$4,117
-
kW-mo/yr
|
$567 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs