| Assessment Year | 2018 |
|---|---|
| Principal Product | Structural Steel |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 55 |
| Plant Area |
283,000
ft2
|
| Annual Production | 5,000
ton
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $245,655 | 1,098,760 |
kWh
|
$0.22 |
| Electricity Fees | $31,644 | - |
|
- |
| Natural Gas | $7,091 | 481 |
MMBtu
|
$14.75 |
| TOTAL YEARLY COSTS | $284,390 | |||
| RECOMMENDED SAVINGS* | $256,176 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $128,472 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $49,766 | - |
$49,766
197,193
kWh
|
- | - | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,260 | - |
$17,220
68,238
kWh
|
- | - | $(-960.0) | - | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,078 | $160 |
$2,078
8,232
kWh
|
- | - | - | - | - | |
| 04 | 2.7224: Reduce space conditioning during non-working hours | $3,086 | $354 |
$80
315
kWh
|
- |
$3,006
-
MMBtu
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $60,368 | $59,620 |
$57,443
227,614
kWh
|
- | - | $2,190 | - | $735 | |
| 06 | 2.9114: Use solar heat to make electricty | $124,618 | $491,526 |
$115,232
456,598
kWh
|
$8,498 | - | - | $888 | - | |
| TOTAL RECOMMENDED | $256,176 | $551,660 |
$241,819
958,190
kWh
|
$8,498 |
$3,006
-
MMBtu
|
$1,230 | $888 | $735 | ||
| TOTAL IMPLEMENTED | $128,472 | $59,780 |
$126,507
501,277
kWh
|
- | - | $1,230 | - | $735 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs