ITAC Assessment: SF0517
ITAC logo
ITAC Assessment: SF0517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 13,372,920
ft2
Annual Production 1,328,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,015 787,512
kWh
Natural Gas $19,663 1,710
MMBtu
TOTAL YEARLY COSTS $150,678
RECOMMENDED SAVINGS* $278,388 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $278,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $7,086 $200 $7,086
42,595
kWh
- - -
02 2.4313: Provide proper maintenance of motor driven equipment $284 $100 $284
1,704
kWh
- - -
03 2.7224: Reduce space conditioning during non-working hours $1,563 $803 - $1,563
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,262 $6,590 $6,262
36,938
kWh
- - -
05 2.1336: Install equipment to utilize waste fuel $14,634 $50,965 - $14,634
-
MMBtu
- -
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $47,532 $293,579 $119,828
720,252
kWh
$(-15,187.0)
-
MMBtu
$(-19,951.0) $(-37,158.0)
07 2.9114: Use solar heat to make electricty $201,027 $1,738,526 $201,027
1,208,310
kWh
- - -
TOTAL RECOMMENDED $278,388 $2,090,763 $334,487
2,009,799
kWh
$1,010
-
MMBtu
$(-19,951.0) $(-37,158.0)
TOTAL IMPLEMENTED $278,104 $2,090,663 $334,203
2,008,095
kWh
$1,010
-
MMBtu
$(-19,951.0) $(-37,158.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs