Assessment Year | 2018 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $1 M to 5M |
# of Employees | 14 |
Plant Area |
13,372,920
ft2
|
Annual Production | 1,328,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,015 | 787,512 |
kWh
|
$0.17 |
Natural Gas | $19,663 | 1,710 |
MMBtu
|
$11.50 |
TOTAL YEARLY COSTS | $150,678 | |||
RECOMMENDED SAVINGS* | $278,388 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $278,104 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $7,086 | $200 |
$7,086
42,595
kWh
|
- | - | - | |
02 | 2.4313: Provide proper maintenance of motor driven equipment | $284 | $100 |
$284
1,704
kWh
|
- | - | - | |
03 | 2.7224: Reduce space conditioning during non-working hours | $1,563 | $803 | - |
$1,563
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,262 | $6,590 |
$6,262
36,938
kWh
|
- | - | - | |
05 | 2.1336: Install equipment to utilize waste fuel | $14,634 | $50,965 | - |
$14,634
-
MMBtu
|
- | - | |
06 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $47,532 | $293,579 |
$119,828
720,252
kWh
|
$(-15,187.0)
-
MMBtu
|
$(-19,951.0) | $(-37,158.0) | |
07 | 2.9114: Use solar heat to make electricty | $201,027 | $1,738,526 |
$201,027
1,208,310
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $278,388 | $2,090,763 |
$334,487
2,009,799
kWh
|
$1,010
-
MMBtu
|
$(-19,951.0) | $(-37,158.0) | ||
TOTAL IMPLEMENTED | $278,104 | $2,090,663 |
$334,203
2,008,095
kWh
|
$1,010
-
MMBtu
|
$(-19,951.0) | $(-37,158.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs