ITAC Assessment: SF0512
ITAC logo
ITAC Assessment: SF0512
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Recycled Packaging
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 50,000
ft2
Annual Production 758,400
units
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,534 694,523
kWh
Electricity Demand $56,352 3,872
kW-mo/yr
Natural Gas $4,657 374
MMBtu
Waste Disposal Costs
Water Usage $14,977 1,403,346
Tgal
TOTAL YEARLY COSTS $170,520
RECOMMENDED SAVINGS* $69,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,862

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,199 - $1,739
12,736
kWh
- - $(-540.0) -
02 2.7224: Reduce space conditioning during non-working hours $4,566 $698 $983
7,203
kWh
- $3,583
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,202 $9,352 $5,043
36,945
kWh
- - $1,257 $(-98.0)
04 2.2511: Insulate bare equipment $118 $389 - - $118
-
MMBtu
- -
05 2.7135: Install occupancy sensors $6,777 $31,273 $3,821
27,994
kWh
$1,570
-
kW-mo/yr
- $1,403 $(-17.0)
06 2.9114: Use solar heat to make electricty $50,506 $343,102 $50,506
369,950
kWh
- - - -
TOTAL RECOMMENDED $69,368 $384,814 $62,092
454,828
kWh
$1,570
-
kW-mo/yr
$3,701
-
MMBtu
$2,120 $(-115.0)
TOTAL IMPLEMENTED $18,862 $41,712 $11,586
84,878
kWh
$1,570
-
kW-mo/yr
$3,701
-
MMBtu
$2,120 $(-115.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs