ITAC Assessment: SF0511
ITAC logo
ITAC Assessment: SF0511
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Circuit Board Plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 28
Plant Area 10,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 5,720
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,521 784,954
kWh
Electricity Demand $50,846 1,815
kW-mo/yr
Natural Gas $14,196 1,247
MMBtu
TOTAL YEARLY COSTS $185,563
RECOMMENDED SAVINGS* $9,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,993

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2135: Repair and eliminate steam leaks $2,043 - $3,291
21,431
kWh
- - $(-1,248.0) -
02 2.7314: Reduce ventilation air $1,680 - $1,116
7,266
kWh
$564
-
kW-mo/yr
- - -
03 2.2514: Cover open tanks $2,660 $1,059 $2,660
17,322
kWh
- - - -
04 2.2511: Insulate bare equipment $824 $1,526 - - $824
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,786 $5,219 $2,101
13,682
kWh
$171
-
kW-mo/yr
- - $514
TOTAL RECOMMENDED $9,993 $7,804 $9,168
59,701
kWh
$735
-
kW-mo/yr
$824
-
MMBtu
$(-1,248.0) $514
TOTAL IMPLEMENTED $9,993 $7,804 $9,168
59,701
kWh
$735
-
kW-mo/yr
$824
-
MMBtu
$(-1,248.0) $514