ITAC Assessment: SF0508
ITAC logo
ITAC Assessment: SF0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Sports Nutrition Product
NAICS 311224: Soybean and Other Oilseed Processing
SIC 2076: Vegetable Oil Mills, Except Corn, Cottonseed, and Soybean
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 26,500
ft2
Annual Production 8,000,000
units
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,119 329,251
kWh
Natural Gas $9,552 691
MMBtu
TOTAL YEARLY COSTS $96,671
RECOMMENDED SAVINGS* $42,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,154 - $8,234
31,118
kWh
- $(-1,080.0) -
02 2.7224: Reduce space conditioning during non-working hours $20,198 $2,023 $10,858
41,392
kWh
$9,340
-
MMBtu
- -
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $640 $553 $640
2,420
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,172 $20,431 $6,306
23,832
kWh
- $954 $(-88.0)
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,954 $26,825 $5,954
22,503
kWh
- - -
06 2.2441: Preheat boiler makeup water with waste process heat $1,181 $6,155 - $1,181
-
MMBtu
- -
TOTAL RECOMMENDED $42,299 $55,987 $31,992
121,265
kWh
$10,521
-
MMBtu
$(-126.0) $(-88.0)
TOTAL IMPLEMENTED $33,306 $28,848 $25,046
95,013
kWh
$9,340
-
MMBtu
$(-1,080.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings