Assessment Year | 2017 |
---|---|
Principal Product | Sports Nutrition Product |
NAICS | 311224: Soybean and Other Oilseed Processing |
SIC | 2076: Vegetable Oil Mills, Except Corn, Cottonseed, and Soybean |
Sales Range | $50 M to 100M |
# of Employees | 120 |
Plant Area |
26,500
ft2
|
Annual Production | 8,000,000
units
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,119 | 329,251 |
kWh
|
$0.26 |
Natural Gas | $9,552 | 691 |
MMBtu
|
$13.82 |
TOTAL YEARLY COSTS | $96,671 | |||
RECOMMENDED SAVINGS* | $42,299 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,306 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,154 | - |
$8,234
31,118
kWh
|
- | $(-1,080.0) | - | |
02 | 2.7224: Reduce space conditioning during non-working hours | $20,198 | $2,023 |
$10,858
41,392
kWh
|
$9,340
-
MMBtu
|
- | - | |
03 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $640 | $553 |
$640
2,420
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,172 | $20,431 |
$6,306
23,832
kWh
|
- | $954 | $(-88.0) | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,954 | $26,825 |
$5,954
22,503
kWh
|
- | - | - | |
06 | 2.2441: Preheat boiler makeup water with waste process heat | $1,181 | $6,155 | - |
$1,181
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $42,299 | $55,987 |
$31,992
121,265
kWh
|
$10,521
-
MMBtu
|
$(-126.0) | $(-88.0) | ||
TOTAL IMPLEMENTED | $33,306 | $28,848 |
$25,046
95,013
kWh
|
$9,340
-
MMBtu
|
$(-1,080.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs