ITAC Assessment: SF0502
ITAC logo
ITAC Assessment: SF0502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Poultry Products
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range greater than $500
M
# of Employees 1,800
Plant Area 1,500,000
ft2
Annual Production 114,000,000
units
Production Hrs. Annual 6,728
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,661,376 76,416,000
kWh
Electricity Demand $1,510,060 151,008
kW-mo/yr
Natural Gas $5,939,572 845,864
MMBtu
TOTAL YEARLY COSTS $12,111,008
RECOMMENDED SAVINGS* $632,515 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $547,723

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,509 $80 $1,232
20,187
kWh
$277
-
kW-mo/yr
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $379,684 $84,889 $379,684
6,224,329
kWh
- - - -
03 2.6218: Turn off equipment when not in use $10,648 $2,311 $10,648
174,564
kWh
- - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $25,335 $7,208 $25,335
415,328
kWh
- - - -
05 2.1243: Use heat from boiler blowdown to preheat boiler feed water $21,631 $14,971 - - $21,631
-
MMBtu
- -
06 2.5194: Redesign process $46,628 $18,660 $38,077
624,219
kWh
$8,551
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $76,288 $138,203 $58,012
951,011
kWh
$14,379
-
kW-mo/yr
- $6,409 $(-2,512.0)
08 2.6218: Turn off equipment when not in use $11,335 $14,290 $11,335
185,828
kWh
- - - -
09 2.2123: Insulate feedwater tank $1,760 $3,244 - - $1,760
-
MMBtu
- -
10 2.2511: Insulate bare equipment $13,080 $26,316 - - $13,080
-
MMBtu
- -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,617 $187,946 $5,636
92,401
kWh
$1,266
-
kW-mo/yr
$37,715
-
MMBtu
- -
TOTAL RECOMMENDED $632,515 $498,118 $529,959
8,687,867
kWh
$24,473
-
kW-mo/yr
$74,186
-
MMBtu
$6,409 $(-2,512.0)
TOTAL IMPLEMENTED $547,723 $273,404 $498,988
8,180,138
kWh
$23,207
-
kW-mo/yr
$21,631
-
MMBtu
$6,409 $(-2,512.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs