ITAC Assessment: SF0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 300,000
ft2
Annual Production 2,900,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $570,896 6,755,363
kWh
Electricity Demand $303,459 12,849
kW-mo/yr
Natural Gas $4,508 463
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $396,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $392,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3137: Use power during off-peak periods $5,976 - - - $5,976 - - -
02 2.7311: Ventilation system to shut off when room is not in use $6,324 $2,354 $6,324
74,837
kWh
- - - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,559 $6,856 $9,028
106,831
kWh
$3,531
-
kW-mo/yr
- - - -
04 3.4111: Use closed cycle process to minimize waste water production $3,956 $2,003 $3,956
46,810
kWh
- - - - -
05 2.7135: Install occupancy sensors $18,801 $20,415 $17,201
203,537
kWh
$1,600
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $25,062 $48,543 $19,489
230,609
kWh
$5,591
-
kW-mo/yr
- - $2,519 $(-2,537.0)
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $323,906 $1,095,380 $405,790
4,801,680
kWh
$155,892
-
kW-mo/yr
- $(-78,224.0)
-
MMBtu
$(-159,552.0) -
TOTAL RECOMMENDED $396,584 $1,175,551 $461,788
5,464,304
kWh
$166,614
-
kW-mo/yr
$5,976 $(-78,224.0)
-
MMBtu
$(-157,033.0) $(-2,537.0)
TOTAL IMPLEMENTED $392,628 $1,173,548 $457,832
5,417,494
kWh
$166,614
-
kW-mo/yr
$5,976 $(-78,224.0)
-
MMBtu
$(-157,033.0) $(-2,537.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs