Assessment Year | 2016 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
300,000
ft2
|
Annual Production | 2,900,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $570,896 | 6,755,363 |
kWh
|
$0.085 |
Electricity Demand | $303,459 | 12,849 |
kW-mo/yr
|
$23.62 |
Natural Gas | $4,508 | 463 |
MMBtu
|
$9.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $396,584 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $392,628 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3137: Use power during off-peak periods | $5,976 | - | - | - | $5,976 | - | - | - | |
02 | 2.7311: Ventilation system to shut off when room is not in use | $6,324 | $2,354 |
$6,324
74,837
kWh
|
- | - | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,559 | $6,856 |
$9,028
106,831
kWh
|
$3,531
-
kW-mo/yr
|
- | - | - | - | |
04 | 3.4111: Use closed cycle process to minimize waste water production | $3,956 | $2,003 |
$3,956
46,810
kWh
|
- | - | - | - | - | |
05 | 2.7135: Install occupancy sensors | $18,801 | $20,415 |
$17,201
203,537
kWh
|
$1,600
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,062 | $48,543 |
$19,489
230,609
kWh
|
$5,591
-
kW-mo/yr
|
- | - | $2,519 | $(-2,537.0) | |
07 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $323,906 | $1,095,380 |
$405,790
4,801,680
kWh
|
$155,892
-
kW-mo/yr
|
- |
$(-78,224.0)
-
MMBtu
|
$(-159,552.0) | - | |
TOTAL RECOMMENDED | $396,584 | $1,175,551 |
$461,788
5,464,304
kWh
|
$166,614
-
kW-mo/yr
|
$5,976 |
$(-78,224.0)
-
MMBtu
|
$(-157,033.0) | $(-2,537.0) | ||
TOTAL IMPLEMENTED | $392,628 | $1,173,548 |
$457,832
5,417,494
kWh
|
$166,614
-
kW-mo/yr
|
$5,976 |
$(-78,224.0)
-
MMBtu
|
$(-157,033.0) | $(-2,537.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs