Assessment Year | 2015 |
---|---|
Principal Product | adhesive tape, glue, and gummed paper tape |
NAICS | 325520: Adhesive Manufacturing |
SIC | 2891: Adhesives and Sealants |
Sales Range | $10 M to 50M |
# of Employees | 20 |
Plant Area |
40,000
ft2
|
Annual Production | 446,000
units
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $58,616 | 371,760 |
kWh
|
$0.16 |
Electricity Demand | $24,162 | 2,100 |
kW-mo/yr
|
$11.51 |
Natural Gas | $20,315 | 1,942 |
MMBtu
|
$10.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $69,567 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $69,567 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $2,033 | - |
$2,033
12,896
kWh
|
- | - | |
02 | 2.6218: Turn off equipment when not in use | $1,039 | - |
$1,039
6,589
kWh
|
- | - | |
03 | 2.2511: Insulate bare equipment | $2,990 | $822 |
$2,990
18,965
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $496 | $1,340 |
$357
2,264
kWh
|
$139
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $703 | $2,001 |
$520
3,298
kWh
|
$183
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,265 | $9,844 |
$3,018
19,140
kWh
|
$54
-
kW-mo/yr
|
$193 | |
07 | 2.7135: Install occupancy sensors | $1,345 | $5,518 |
$914
5,799
kWh
|
$431
-
kW-mo/yr
|
- | |
08 | 2.9114: Use solar heat to make electricty | $57,696 | $401,249 |
$48,520
307,730
kWh
|
$9,176
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $69,567 | $420,774 |
$59,391
376,681
kWh
|
$9,983
-
kW-mo/yr
|
$193 | ||
TOTAL IMPLEMENTED | $69,567 | $420,774 |
$59,391
376,681
kWh
|
$9,983
-
kW-mo/yr
|
$193 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs