Assessment Year | 2015 |
---|---|
Principal Product | Construction Materials |
NAICS | 212313: Crushed and Broken Granite Mining and Quarrying |
SIC | 1423: Crushed and Broken Granite |
Sales Range | $100 M to 500M |
# of Employees | 90 |
Plant Area |
11,600,000
ft2
|
Annual Production | 4,000,000
ton
|
Production Hrs. Annual | 2,640
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $734,696 | 13,840,967 |
kWh
|
$0.053 |
Electricity Demand | $0.0 | 78,191 |
kW-mo/yr
|
$0.000 |
Natural Gas | $538,122 | 84,082 |
MMBtu
|
$6.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,359 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,437 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,119 | - |
$3,119
58,757
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,437 | - |
$2,437
45,927
kWh
|
- | - | - | |
03 | 2.2511: Insulate bare equipment | $12,922 | $8,500 | - |
$12,922
-
MMBtu
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,324 | $4,543 |
$6,324
119,145
kWh
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,388 | $5,977 |
$1,388
26,155
kWh
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $522 | $2,846 |
$522
9,835
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,647 | $223,755 |
$35,673
672,053
kWh
|
- | $3,631 | $(-6,657.0) | |
TOTAL RECOMMENDED | $59,359 | $245,621 |
$49,463
931,872
kWh
|
$12,922
-
MMBtu
|
$3,631 | $(-6,657.0) | ||
TOTAL IMPLEMENTED | $46,437 | $237,121 |
$49,463
931,872
kWh
|
- | $3,631 | $(-6,657.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs