ITAC Assessment: SF0465
ITAC logo
ITAC Assessment: SF0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Inflatable Boats
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 117
Plant Area 78,092
ft2
Annual Production 1,300
pieces
Production Hrs. Annual 4,992
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,192 562,560
kWh
Electricity Demand $20,337 1,953
kW-mo/yr
LPG $8,632 378
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,904 - $2,904
19,404
kWh
- - -
02 2.2135: Repair and eliminate steam leaks $1,344 $648 $1,344
8,978
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,965 $3,081 $1,965
11,331
kWh
- - -
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $914 $1,510 $718
4,797
kWh
$196
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $13,736 $26,646 $11,787
78,756
kWh
$2,538
-
kW-mo/yr
$401 $(-990.0)
TOTAL RECOMMENDED $20,863 $31,885 $18,718
123,266
kWh
$2,734
-
kW-mo/yr
$401 $(-990.0)
TOTAL IMPLEMENTED $15,080 $27,294 $13,131
87,734
kWh
$2,538
-
kW-mo/yr
$401 $(-990.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs