Assessment Year | 2015 |
---|---|
Principal Product | Sparkling Wine, Wine |
NAICS | 312130: Wineries |
SIC | 2084: Wines, Brandy, and Brandy Spirits |
Sales Range | $5 M to 10M |
# of Employees | 140 |
Plant Area |
69,500
ft2
|
Annual Production | 80,000
units
|
Production Hrs. Annual | 3,776
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,558 | 674,998 |
kWh
|
$0.17 |
Electricity Fees | $1,327 | - |
|
- |
LPG | $41,365 | 1,657 |
MMBtu
|
$24.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,371 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,716 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,239 | $75 |
$1,239
7,236
kWh
|
- | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,905 | $3,053 |
$4,905
28,653
kWh
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $2,517 | $4,371 |
$2,517
14,701
kWh
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,570 | $7,605 |
$4,570
26,692
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,819 | $80,476 |
$20,599
120,321
kWh
|
- | $4,111 | $4,109 | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $231 | $1,000 |
$231
1,352
kWh
|
- | - | - | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $424 | $2,004 |
$1,122
6,552
kWh
|
$(-698.0)
-
MMBtu
|
- | - | |
08 | 3.4154: Eliminate leaks in water lines and valves | $666 | $50 |
$666
3,888
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $43,371 | $98,634 |
$35,849
209,395
kWh
|
$(-698.0)
-
MMBtu
|
$4,111 | $4,109 | ||
TOTAL IMPLEMENTED | $42,716 | $95,630 |
$34,496
201,491
kWh
|
- | $4,111 | $4,109 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs