ITAC Assessment: SF0456
ITAC logo
ITAC Assessment: SF0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Apparel
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2331: Women's, Misses', and Juniors' Blouses and Shirts
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 19,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 5,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,207 136,120
kWh
Natural Gas $58,336 6,279
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,474

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $8,140 - $2,716
13,590
kWh
$5,424
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,324 $80 $1,324
6,622
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $883 $327 $883
4,415
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $114 $127 $114
570
kWh
-
05 2.2511: Insulate bare equipment $502 $638 - $502
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,511 $18,537 $7,511
35,903
kWh
-
TOTAL RECOMMENDED $18,474 $19,709 $12,548
61,100
kWh
$5,926
-
MMBtu
TOTAL IMPLEMENTED $18,474 $19,709 $12,548
61,100
kWh
$5,926
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs