ITAC Assessment: SF0454
ITAC logo
ITAC Assessment: SF0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Transformers
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 105,400
ft2
Annual Production 84
pieces
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $397,257 3,328,517
kWh
Electricity Demand $229,436 9,480
kW-mo/yr
Electricity Fees $6,713 -
Natural Gas $21,317 2,227
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $164,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2135: Repair and eliminate steam leaks $6,081 - $6,081
65,015
kWh
- - - -
02 2.7224: Reduce space conditioning during non-working hours $1,343 - $1,343
12,617
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $32,894 $68,183 $24,384
229,042
kWh
$10,493
-
kW-mo/yr
- - $(-1,983.0)
04 2.7134: Use photocell controls $5,656 $20,482 $3,573
33,561
kWh
$2,083
-
kW-mo/yr
- - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $22,823 - - - $22,823 - -
06 2.3511: Use plant owned transformers or lease transformers $67,626 $187,500 - - $67,626 - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $28,103 $27,500 - - - $28,103 -
TOTAL RECOMMENDED $164,526 $303,665 $35,381
340,235
kWh
$12,576
-
kW-mo/yr
$90,449 $28,103 $(-1,983.0)
TOTAL IMPLEMENTED $40,318 $68,183 $31,808
306,674
kWh
$10,493
-
kW-mo/yr
- - $(-1,983.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs