| Assessment Year | 2014 |
|---|---|
| Principal Product | Treated wastewater |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4952: Sewerage Systems |
| Sales Range | less than $500 k |
| # of Employees | 7 |
| Plant Area |
348,480
ft2
|
| Annual Production | 331,066
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $212,348 | 2,705,248 |
kWh
|
$0.078 |
| Electricity Demand | $29,490 | 4,396 |
kW-mo/yr
|
$6.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $69,652 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,968 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.7141: Improve cleaning efficiency by maintaining cleaning system | $13,134 | $1,372 |
$11,757
149,796
kWh
|
$1,377
-
kW-mo/yr
|
- | |
| 02 | 2.7224: Reduce space conditioning during non-working hours | $1,312 | $552 |
$950
12,106
kWh
|
- |
$362
-
MMBtu
|
|
| 03 | 2.4322: Use or replace with energy efficient substitutes | $27,969 | $47,618 |
$25,037
318,986
kWh
|
$2,932
-
kW-mo/yr
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,986 | $6,681 |
$1,778
22,650
kWh
|
$208
-
kW-mo/yr
|
- | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,913 | $23,541 |
$4,398
56,030
kWh
|
$515
-
kW-mo/yr
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $536 | $2,722 |
$480
6,110
kWh
|
$56
-
kW-mo/yr
|
- | |
| 07 | 2.4322: Use or replace with energy efficient substitutes | $19,802 | $104,674 |
$17,726
225,843
kWh
|
$2,076
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $69,652 | $187,160 |
$62,126
791,521
kWh
|
$7,164
-
kW-mo/yr
|
$362
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,968 | $11,327 |
$14,965
190,662
kWh
|
$1,641
-
kW-mo/yr
|
$362
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs