| Assessment Year | 2014 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $5 M to 10M |
| # of Employees | 10 |
| Plant Area |
871,200
ft2
|
| Annual Production | 1,474,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $341,148 | 6,761,080 |
kWh
|
$0.050 |
| Electricity Demand | $163,560 | 14,275 |
kW-mo/yr
|
$11.46 |
| Electricity Fees | $62,774 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $31,291 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,781 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $5,956 | - |
$1,019
17,033
kWh
|
- | $4,937 | |
| 02 | 2.6218: Turn off equipment when not in use | $4,452 | - |
$3,674
56,014
kWh
|
$778
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,914 | $40,248 |
$7,093
197,594
kWh
|
$1,821
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,941 | $50 |
$3,136
52,424
kWh
|
$805
-
kW-mo/yr
|
- | |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,825 | $7,952 |
$743
12,425
kWh
|
$2,421
-
kW-mo/yr
|
$(-339.0) | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,203 | $17,082 |
$5,203
86,992
kWh
|
- | - | |
| TOTAL RECOMMENDED | $31,291 | $65,332 |
$20,868
422,482
kWh
|
$5,825
-
kW-mo/yr
|
$4,598 | ||
| TOTAL IMPLEMENTED | $8,781 | $7,952 |
$1,762
29,458
kWh
|
$2,421
-
kW-mo/yr
|
$4,598 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs