ITAC Assessment: SF0448
ITAC logo
ITAC Assessment: SF0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 871,200
ft2
Annual Production 1,474,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $341,148 6,761,080
kWh
Electricity Demand $163,560 14,275
kW-mo/yr
Electricity Fees $62,774 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,291 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,781

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7224: Reduce space conditioning during non-working hours $5,956 - $1,019
17,033
kWh
- $4,937
02 2.6218: Turn off equipment when not in use $4,452 - $3,674
56,014
kWh
$778
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,914 $40,248 $7,093
197,594
kWh
$1,821
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,941 $50 $3,136
52,424
kWh
$805
-
kW-mo/yr
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,825 $7,952 $743
12,425
kWh
$2,421
-
kW-mo/yr
$(-339.0)
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,203 $17,082 $5,203
86,992
kWh
- -
TOTAL RECOMMENDED $31,291 $65,332 $20,868
422,482
kWh
$5,825
-
kW-mo/yr
$4,598
TOTAL IMPLEMENTED $8,781 $7,952 $1,762
29,458
kWh
$2,421
-
kW-mo/yr
$4,598
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs