ITAC Assessment: SF0441
ITAC logo
ITAC Assessment: SF0441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product magnetometers, directional sensors and electronic systems used in old an
NAICS 334515: Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 30,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,963 808,713
kWh
Electricity Demand $25,880 2,669
kW-mo/yr
Natural Gas $16,564 1,777
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,095

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $27,444 - $19,335
153,487
kWh
- - $8,109
-
MMBtu
02 2.7144: Install spectral reflectors / delamp $651 $420 $483
3,830
kWh
$168
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $5,725 $23,868 $4,062
32,212
kWh
$1,663
-
kW-mo/yr
- -
04 2.8112: Combine utility meters $1,679 $3,085 - - $1,679 -
05 2.9114: Use solar heat to make electricty $46,828 $377,867 $43,690
337,061
kWh
$3,138
-
kW-mo/yr
- -
TOTAL RECOMMENDED $82,327 $405,240 $67,570
526,590
kWh
$4,969
-
kW-mo/yr
$1,679 $8,109
-
MMBtu
TOTAL IMPLEMENTED $28,095 $420 $19,818
157,317
kWh
$168
-
kW-mo/yr
- $8,109
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs