ITAC Assessment: SF0434
ITAC logo
ITAC Assessment: SF0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Treated Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 7
Plant Area 467,199
ft2
Annual Production 2,154,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,887 3,133,871
kWh
Electricity Demand $28,872 8,249
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,312

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $2,448 $4,896 $2,272
32,445
kWh
$176
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $56,039 $250,000 $52,531
731,631
kWh
$3,508
-
kW-mo/yr
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $846 $4,207 $706
9,828
kWh
$567
-
kW-mo/yr
$(-427.0)
-
MMBtu
04 2.4133: Use most efficient type of electric motors $2,864 $15,486 $2,685
37,401
kWh
$179
-
kW-mo/yr
-
TOTAL RECOMMENDED $62,197 $274,589 $58,194
811,305
kWh
$4,430
-
kW-mo/yr
$(-427.0)
-
MMBtu
TOTAL IMPLEMENTED $5,312 $20,382 $4,957
69,846
kWh
$355
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs