Assessment Year | 2013 |
---|---|
Principal Product | asphalt shingles |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
175,000
ft2
|
Annual Production | 1,200,000
pieces
|
Production Hrs. Annual | 4,800
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $392,900 | 4,803,131 |
kWh
|
$0.082 |
Electricity Demand | $237,654 | 12,971 |
kW-mo/yr
|
$18.32 |
Electricity Fees | $1,330 | - |
|
- |
Natural Gas | $268,940 | 53,155 |
MMBtu
|
$5.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,307 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,938 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7144: Install spectral reflectors / delamp | $1,312 | $393 |
$646
7,826
kWh
|
$666
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,790 | $3,152 |
$3,790
45,878
kWh
|
- | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $10,785 | $9,062 |
$6,937
83,981
kWh
|
$3,848
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,718 | $11,431 |
$4,718
57,114
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $7,030 | $21,402 |
$2,748
33,271
kWh
|
$4,282
-
kW-mo/yr
|
- | - | |
06 | 2.2424: Use heat in flue gases to preheat products or materials | $9,806 | $46,860 | - | - | - |
$9,806
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,866 | $32,002 |
$5,888
71,281
kWh
|
- | $(-22.0) | - | |
TOTAL RECOMMENDED | $43,307 | $124,302 |
$24,727
299,351
kWh
|
$8,796
-
kW-mo/yr
|
$(-22.0) |
$9,806
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,938 | $71,807 |
$7,184
86,975
kWh
|
$4,948
-
kW-mo/yr
|
- |
$9,806
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs