ITAC Assessment: SF0433
ITAC logo
ITAC Assessment: SF0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product asphalt shingles
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 175,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $392,900 4,803,131
kWh
Electricity Demand $237,654 12,971
kW-mo/yr
Electricity Fees $1,330 -
Natural Gas $268,940 53,155
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,307 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,938

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7144: Install spectral reflectors / delamp $1,312 $393 $646
7,826
kWh
$666
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,790 $3,152 $3,790
45,878
kWh
- - -
03 2.4239: Eliminate or reduce compressed air usage $10,785 $9,062 $6,937
83,981
kWh
$3,848
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,718 $11,431 $4,718
57,114
kWh
- - -
05 2.7135: Install occupancy sensors $7,030 $21,402 $2,748
33,271
kWh
$4,282
-
kW-mo/yr
- -
06 2.2424: Use heat in flue gases to preheat products or materials $9,806 $46,860 - - - $9,806
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,866 $32,002 $5,888
71,281
kWh
- $(-22.0) -
TOTAL RECOMMENDED $43,307 $124,302 $24,727
299,351
kWh
$8,796
-
kW-mo/yr
$(-22.0) $9,806
-
MMBtu
TOTAL IMPLEMENTED $21,938 $71,807 $7,184
86,975
kWh
$4,948
-
kW-mo/yr
- $9,806
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs