ITAC Assessment: SF0432
ITAC logo
ITAC Assessment: SF0432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Treated waste water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area 1,431,654
ft2
Annual Production 8,961
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,274,909 15,825,648
kWh
Electricity Demand $469,613 29,171
kW-mo/yr
Electricity Fees $23,018 -
Natural Gas $20,171 2,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,322 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $143,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $11,539 - $571
7,000
kWh
- $10,968
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $5,729 - $5,729
70,248
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $59,942 $176,082 $46,682
572,432
kWh
$13,260
-
kW-mo/yr
-
04 2.6212: Turn off equipment during breaks, reduce operating time $70,722 $226,685 $55,077
675,381
kWh
$15,645
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $20,321 $22,006 $15,826
194,061
kWh
$4,495
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $41,285 $208,561 $34,260
420,112
kWh
$7,025
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $10,784 $5,853 $8,398
102,984
kWh
$2,386
-
kW-mo/yr
-
TOTAL RECOMMENDED $220,322 $639,187 $166,543
2,042,218
kWh
$42,811
-
kW-mo/yr
$10,968
-
MMBtu
TOTAL IMPLEMENTED $143,112 $463,105 $113,561
1,392,538
kWh
$29,551
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs