Assessment Year | 2013 |
---|---|
Principal Product | Treated waste water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 132 |
Plant Area |
1,431,654
ft2
|
Annual Production | 8,961
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,274,909 | 15,825,648 |
kWh
|
$0.081 |
Electricity Demand | $469,613 | 29,171 |
kW-mo/yr
|
$16.10 |
Electricity Fees | $23,018 | - |
|
- |
Natural Gas | $20,171 | 2,229 |
MMBtu
|
$9.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $220,322 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $143,112 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $11,539 | - |
$571
7,000
kWh
|
- |
$10,968
-
MMBtu
|
|
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,729 | - |
$5,729
70,248
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $59,942 | $176,082 |
$46,682
572,432
kWh
|
$13,260
-
kW-mo/yr
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $70,722 | $226,685 |
$55,077
675,381
kWh
|
$15,645
-
kW-mo/yr
|
- | |
05 | 2.4322: Use or replace with energy efficient substitutes | $20,321 | $22,006 |
$15,826
194,061
kWh
|
$4,495
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41,285 | $208,561 |
$34,260
420,112
kWh
|
$7,025
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $10,784 | $5,853 |
$8,398
102,984
kWh
|
$2,386
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $220,322 | $639,187 |
$166,543
2,042,218
kWh
|
$42,811
-
kW-mo/yr
|
$10,968
-
MMBtu
|
||
TOTAL IMPLEMENTED | $143,112 | $463,105 |
$113,561
1,392,538
kWh
|
$29,551
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs