Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Liquid Cell culture media and buffers
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 24
Plant Area 98,000
ft2
Annual Production 678,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $625,711 9,801,955
kWh
Electricity Demand $53,948 20,067
kW-mo/yr
Natural Gas $227,159 45,734
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $18,116 $16,400 $18,116
283,773
kWh
- -
02 2.7135: Install occupancy sensors $4,128 $6,040 $4,128
64,656
kWh
- -
03 2.7292: Lower ceiling to reduce conditioned space $9,091 $25,000 $8,961
138,341
kWh
$130
-
kW-mo/yr
-
04 2.7292: Lower ceiling to reduce conditioned space $6,580 $25,750 $6,485
101,589
kWh
$95
-
kW-mo/yr
-
05 2.1223: Install smaller boiler (increase high fire duty cycle) $14,550 $28,000 - - $14,550
-
MMBtu
06 2.7229: Air condition only space necessary $46,961 $5,500 $44,355
694,781
kWh
$2,606
-
kW-mo/yr
-
TOTAL RECOMMENDED $99,426 $106,690 $82,045
1,283,140
kWh
$2,831
-
kW-mo/yr
$14,550
-
MMBtu
TOTAL IMPLEMENTED $22,244 $22,440 $22,244
348,429
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs