ITAC Assessment: SF0429
ITAC logo
ITAC Assessment: SF0429
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Licorice Candy
NAICS 311340: Nonchocolate Confectionery Manufacturing
SIC 2064: Candy and Other Confectionery Products
Sales Range $50
M
to 100
M
# of Employees 186
Plant Area 250,000
ft2
Annual Production 379
lb
Production Hrs. Annual 6,554
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $548,359 5,634,410
kWh
Electricity Demand $236,777 14,448
kW-mo/yr
Electricity Fees $27,154 -
Natural Gas $853,717 139,785
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $284,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1212: Operate boilers on high fire setting $18,109 - $2,040
20,957
kWh
$679
-
kW-mo/yr
- $15,390
-
MMBtu
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $578 $810 - - - $578
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,006 $16,020 $5,799
59,586
kWh
$1,207
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $14,210 $38,634 $11,066
133,708
kWh
$3,144
-
kW-mo/yr
- -
05 2.4227: Use compressor air filters $9,736 $36,817 $9,736
100,035
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $919 $5,601 $919
9,439
kWh
- - -
07 2.3132: Recharge batteries on during off-peak demand periods $4,991 - - - $4,991 -
08 2.2437: Recover waste heat from equipment $228,512 - - - - $228,512
-
MMBtu
TOTAL RECOMMENDED $284,061 $97,882 $29,560
323,725
kWh
$5,030
-
kW-mo/yr
$4,991 $244,480
-
MMBtu
TOTAL IMPLEMENTED $11,233 $43,228 $10,655
109,474
kWh
- - $578
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs