Assessment Year | 2012 |
---|---|
Principal Product | Food Product Machinery |
NAICS | 333241: Food Product Machinery Manufacturing |
SIC | 3556: Food Products Machinery |
Sales Range | $50 M to 100M |
# of Employees | 143 |
Plant Area |
300,000
ft2
|
Annual Production | 150
pieces
|
Production Hrs. Annual | 2,565
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $188,422 | 1,921,117 |
kWh
|
$0.098 |
Electricity Demand | $86,173 | 5,700 |
kW-mo/yr
|
$15.12 |
Natural Gas | $67,789 | 9,135 |
MMBtu
|
$7.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,676 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,472 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $40,533 | - |
$22,272
227,029
kWh
|
- | - |
$18,261
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,408 | - |
$8,408
94,280
kWh
|
- | - | - | |
03 | 2.4323: Use optimum size and capacity equipment | $10,193 | $9,787 |
$10,193
103,905
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,230 | $15,467 |
$3,830
39,037
kWh
|
$400
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $1,301 | $8,388 |
$730
7,436
kWh
|
$571
-
kW-mo/yr
|
- | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $11,222 | $0.0 | - | - | $11,222 | - | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,705 | $0.0 | - | - | $1,705 | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $84 | $107 |
$17
174
kWh
|
$67
-
kW-mo/yr
|
- | - | |
09 | 2.8114: Change rate schedules or other changes in utility service | $0.0 | $0.0 | - | - | $0.0 | - | |
TOTAL RECOMMENDED | $77,676 | $33,749 |
$45,450
471,861
kWh
|
$1,038
-
kW-mo/yr
|
$12,927 |
$18,261
-
MMBtu
|
||
TOTAL IMPLEMENTED | $54,472 | $23,855 |
$35,240
367,782
kWh
|
$971
-
kW-mo/yr
|
- |
$18,261
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs