ITAC Assessment: SF0417
ITAC logo
ITAC Assessment: SF0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Composite Wood Doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 57
Plant Area 303,000
ft2
Annual Production 884,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,395 2,465,507
kWh
Electricity Demand $206,867 10,800
kW-mo/yr
Natural Gas $3,706 389
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,387 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,019

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,561 - - - - - $12,561
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,459 - $2,459
36,625
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $915 $58 $413
4,792
kWh
$502
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,237 $239 $558
6,483
kWh
$679
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $37,829 $21,581 $17,076
198,238
kWh
$20,753
-
kW-mo/yr
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,063 $2,490 - - $2,063 - -
07 2.7135: Install occupancy sensors $6,916 $31,417 $3,126
36,286
kWh
$3,790
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,407 $16,180 $1,249
14,496
kWh
$1,161
-
kW-mo/yr
$83 $(-86.0) -
TOTAL RECOMMENDED $66,387 $71,965 $24,881
296,920
kWh
$26,885
-
kW-mo/yr
$2,146 $(-86.0) $12,561
TOTAL IMPLEMENTED $13,019 $47,836 $7,392
93,890
kWh
$5,630
-
kW-mo/yr
$83 $(-86.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs