ITAC Assessment: SF0402
ITAC logo
ITAC Assessment: SF0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Seals and Gaskets
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 100,000
ft2
Annual Production 120,000
lb
Production Hrs. Annual 2,470
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,637 653,760
kWh
Electricity Demand $20,916 2,326
kW-mo/yr
Electricity Fees $684 -
Natural Gas $15,192 1,665
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7134: Use photocell controls $1,438 $3,737 $1,050
10,795
kWh
$388
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $2,857 $10,811 $2,142
22,019
kWh
$788
-
kW-mo/yr
- $(-120.0) $47
03 2.7141: Lower light fixtures in high ceiling areas $5,402 $23,288 $3,977
40,869
kWh
$1,470
-
kW-mo/yr
- $(-200.0) $155
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,789 $29,916 $3,619
37,190
kWh
$680
-
kW-mo/yr
- $353 $137
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $766 $4,483 $797
8,190
kWh
$283
-
kW-mo/yr
$(-314.0)
-
MMBtu
- -
06 2.4131: Size electric motors for peak operating efficiency $1,637 $11,070 $1,637
16,824
kWh
- - - -
TOTAL RECOMMENDED $16,889 $83,305 $13,222
135,887
kWh
$3,609
-
kW-mo/yr
$(-314.0)
-
MMBtu
$33 $339
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs