ITAC Assessment: SD0108
ITAC logo
ITAC Assessment: SD0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Composite Cans
NAICS
n/a
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 164,000
ft2
Annual Production 270,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,949 2,495,604
kWh
Natural Gas $15,661 2,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,729

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $5,729 $4,910 $5,729
56,858
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $7,762 $14,570 $7,762
77,081
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $938 $920 $938
9,379
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $18,423 $45,026 $18,423
186,108
kWh
-
05 2.7144: Install spectral reflectors / delamp $2,269 $3,995 $2,269
21,395
kWh
-
06 2.7135: Install occupancy sensors $833 $1,026 $833
7,620
kWh
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $23,250 $2,000 - $23,250
-
lb
TOTAL RECOMMENDED $59,204 $72,447 $35,954
358,441
kWh
$23,250
-
lb
TOTAL IMPLEMENTED $5,729 $4,910 $5,729
56,858
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs