Assessment Year | 2010 |
---|---|
Principal Product | Wine |
NAICS | 312130: Wineries |
SIC | 2084: Wines, Brandy, and Brandy Spirits |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
57,835
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,964 | 1,110,463 |
kWh
|
$0.097 |
Electricity Demand | $56,996 | 3,637 |
kW-mo/yr
|
$15.67 |
Natural Gas | $14,597 | 1,464 |
MMBtu
|
$9.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,114 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $229 | $40 |
$177
1,707
kWh
|
$52
-
kW-mo/yr
|
|
02 | 2.7135: Install occupancy sensors | $245 | $618 |
$63
6,012
kWh
|
$182
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,563 | $42,318 |
$8,078
77,686
kWh
|
$3,485
-
kW-mo/yr
|
|
04 | 2.7232: Replace existing hvac unit with high efficiency model | $6,697 | $28,699 |
$6,697
58,892
kWh
|
- | |
05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $4,340 | $20,638 |
$4,340
42,312
kWh
|
- | |
06 | 2.2511: Insulate bare equipment | $222 | $1,278 |
$222
2,132
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,819 | $14,000 |
$771
7,396
kWh
|
$1,048
-
kW-mo/yr
|
|
08 | 2.7241: Install outside air damper / economizer on hvac unit | $2,999 | $26,118 |
$2,999
28,838
kWh
|
- | |
TOTAL RECOMMENDED | $28,114 | $133,709 |
$23,347
224,975
kWh
|
$4,767
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs