ITAC Assessment: SF0382
ITAC logo
ITAC Assessment: SF0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Chocolate
NAICS 311351: Chocolate and Confectionery Manufacturing from Cacao Beans
SIC 2066: Chocolate and Cocoa Products
Sales Range $100
M
to 500
M
# of Employees 110
Plant Area 120,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,403,559 16,486,181
kWh
Electricity Demand $469,385 78,217
kW-mo/yr
Natural Gas $393,703 33,144
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $288,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $99,723

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $9,146 $2,700 - - $9,146
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,775 $7,837 $10,775
114,199
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,878 $1,247 $1,878
14,994
kWh
- -
04 2.2511: Insulate bare equipment $53,897 $49,178 $49,126
520,682
kWh
$4,771
-
kW-mo/yr
-
05 2.7134: Use photocell controls $4,141 $6,637 $4,141
33,355
kWh
- -
06 2.4133: Use most efficient type of electric motors $4,265 $8,098 $4,265
45,252
kWh
- -
07 2.4234: Cool compressor air intake with heat exchanger $10,035 $18,281 $10,035
106,355
kWh
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,262 $14,381 $7,262
76,965
kWh
- -
09 2.2314: Replace heat treating oven with more efficient unit $165,218 $158,868 $150,474
1,594,844
kWh
$14,744
-
kW-mo/yr
-
10 2.7135: Install occupancy sensors $12,608 $36,493 $12,608
119,278
kWh
- -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $733 $2,953 $733
7,773
kWh
- -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $8,423 $62,855 $8,423
77,248
kWh
- -
TOTAL RECOMMENDED $288,381 $369,528 $259,720
2,710,945
kWh
$19,515
-
kW-mo/yr
$9,146
-
MMBtu
TOTAL IMPLEMENTED $99,723 $168,653 $85,806
872,535
kWh
$4,771
-
kW-mo/yr
$9,146
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs