Assessment Year | 2008 |
---|---|
Principal Product | fiber drums |
NAICS | 322219: Other Paperboard Container Manufacturing |
SIC | 2655: Fiber Cans, Tubes, Drums, and Similar Products |
Sales Range | $10 M to 50M |
# of Employees | 69 |
Plant Area |
128,000
ft2
|
Annual Production | 1,218,097
pieces
|
Production Hrs. Annual | 3,990
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $176,644 | 1,095,900 |
kWh
|
$0.16 |
Electricity Fees | $315 | - |
|
- |
Natural Gas | $40,929 | 3,650 |
MMBtu
|
$11.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $121,067 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,007 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,195 | - |
$15,195
85,189
kWh
|
|
02 | 2.7134: Use photocell controls | $1,238 | $786 |
$1,238
6,943
kWh
|
|
03 | 2.7135: Install occupancy sensors | $666 | $584 |
$666
3,734
kWh
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,838 | $2,773 |
$2,838
15,908
kWh
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $146 | $200 |
$146
821
kWh
|
|
06 | 2.7134: Use photocell controls | $1,435 | $2,319 |
$1,435
6,971
kWh
|
|
07 | 2.4133: Use most efficient type of electric motors | $781 | $1,851 |
$781
4,379
kWh
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,812 | $56,073 |
$9,812
55,012
kWh
|
|
09 | 2.9114: Use solar heat to make electricty | $88,956 | $1,020,250 |
$88,956
498,717
kWh
|
|
TOTAL RECOMMENDED | $121,067 | $1,084,836 |
$121,067
677,674
kWh
|
||
TOTAL IMPLEMENTED | $25,007 | $56,073 |
$25,007
140,201
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs