ITAC Assessment: SF0356
ITAC logo
ITAC Assessment: SF0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Bottled Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $100
M
to 500
M
# of Employees 241
Plant Area 230,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,020
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $401,548 16,890
kWh
Electricity Demand $153,417 11,671
kW-mo/yr
Electricity Fees $13,195 -
Natural Gas $151,347 15,169
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $138,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,092

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,321 $150 $5,321
52,472
kWh
- - -
02 2.3113: Make ice during off peak hours for cooling $41,503 - - - - $41,503
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,655 $6,281 $6,655
80,413
kWh
- - -
04 2.2511: Insulate bare equipment $2,504 $3,760 - - $2,504
-
MMBtu
-
05 2.7212: Install or upgrade insulation on hvac distribution systems $17,740 $26,898 $17,740
213,716
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $37,472 $80,535 $23,011
280,345
kWh
$14,461
-
kW-mo/yr
- -
07 2.2628: Utilize a less expensive cooling method $4,534 $10,979 $3,897
43,924
kWh
$637
-
kW-mo/yr
- -
08 3.4111: Use closed cycle process to minimize waste water production $1,532 $4,549 $1,532
19,975
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $12,225 $40,545 $9,695
118,119
kWh
$2,530
-
kW-mo/yr
- -
10 2.4322: Use or replace with energy efficient substitutes $8,810 $36,311 $6,727
8,959
kWh
$2,083
-
kW-mo/yr
- -
TOTAL RECOMMENDED $138,296 $210,008 $74,578
817,923
kWh
$19,711
-
kW-mo/yr
$2,504
-
MMBtu
$41,503
TOTAL IMPLEMENTED $74,092 $154,259 $57,101
692,593
kWh
$16,991
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs