ITAC Assessment: SF0343
ITAC logo
ITAC Assessment: SF0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 42
Plant Area 33,000
ft2
Annual Production 4,160,000
lb
Production Hrs. Annual 5,460
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,077 364,710
kWh
Electricity Demand $9,844 1,260
kW-mo/yr
Natural Gas $85,967 8,036
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,431

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $1,112 $220 - - $1,112
-
MMBtu
02 2.2437: Recover waste heat from equipment $6,925 $6,063 - - $6,925
-
MMBtu
03 2.4133: Use most efficient type of electric motors $385 $364 $292
2,815
kWh
$93
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,009 $9,569 $1,703
16,426
kWh
$306
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,431 $16,216 $1,995
19,241
kWh
$399
-
kW-mo/yr
$8,037
-
MMBtu
TOTAL IMPLEMENTED $10,431 $16,216 $1,995
19,241
kWh
$399
-
kW-mo/yr
$8,037
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs