Assessment Year | 2006 |
---|---|
Principal Product | Juice |
NAICS | 311421: Fruit and Vegetable Canning |
SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
156,601
ft2
|
Annual Production | 40,000,000
Tgal
|
Production Hrs. Annual | 6,696
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $895,101 | 9,718,418 |
kWh
|
$0.092 |
Electricity Demand | $302,047 | 22,193 |
kW-mo/yr
|
$13.61 |
Natural Gas | $337,311 | 36,039 |
MMBtu
|
$9.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $319,902 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $196,713 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $284 | - |
$284
9,693
kWh
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $60,485 | $21,245 | - | - |
$60,485
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $3,339 | $1,175 | - | - |
$3,339
-
MMBtu
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $7,924 | $4,936 |
$5,151
58,762
kWh
|
$2,773
-
kW-mo/yr
|
- | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $54,378 | $37,915 |
$54,378
-
kWh
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $4,006 | $2,768 |
$2,834
32,883
kWh
|
$1,172
-
kW-mo/yr
|
- | - | |
07 | 2.7135: Install occupancy sensors | $12,415 | $13,077 |
$9,987
100,448
kWh
|
$2,428
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,326 | $37,484 |
$26,003
301,694
kWh
|
$6,323
-
kW-mo/yr
|
- | - | |
09 | 2.8114: Change rate schedules or other changes in utility service | $11,683 | $21,175 |
$11,683
-
kWh
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,611 | $3,591 |
$1,016
11,794
kWh
|
$595
-
kW-mo/yr
|
- | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,262 | $23,694 |
$6,234
72,331
kWh
|
$2,028
-
kW-mo/yr
|
- | - | |
12 | 2.2111: Install steam trap | $1,696 | $4,340 | - | - |
$1,696
-
MMBtu
|
- | |
13 | 2.3113: Make ice during off peak hours for cooling | $87,302 | $912,000 |
$38,694
1,442,492
kWh
|
$48,608
-
kW-mo/yr
|
- | - | |
14 | 3.1161: Eliminate/reduce an operation | $34,191 | $22,085 | - | - | - |
$34,191
-
Tgal
|
|
TOTAL RECOMMENDED | $319,902 | $1,105,485 |
$156,264
2,030,097
kWh
|
$63,927
-
kW-mo/yr
|
$65,520
-
MMBtu
|
$34,191
-
Tgal
|
||
TOTAL IMPLEMENTED | $196,713 | $167,060 |
$117,570
587,605
kWh
|
$15,319
-
kW-mo/yr
|
$63,824
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs