ITAC Assessment: SF0335
ITAC logo
ITAC Assessment: SF0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Juice
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 156,601
ft2
Annual Production 40,000,000
Tgal
Production Hrs. Annual 6,696
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $895,101 9,718,418
kWh
Electricity Demand $302,047 22,193
kW-mo/yr
Natural Gas $337,311 36,039
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $319,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $196,713

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.2135: Repair and eliminate steam leaks $284 - $284
9,693
kWh
- - -
02 2.2437: Recover waste heat from equipment $60,485 $21,245 - - $60,485
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $3,339 $1,175 - - $3,339
-
MMBtu
-
04 2.4239: Eliminate or reduce compressed air usage $7,924 $4,936 $5,151
58,762
kWh
$2,773
-
kW-mo/yr
- -
05 2.8114: Change rate schedules or other changes in utility service $54,378 $37,915 $54,378
-
kWh
- - -
06 2.7135: Install occupancy sensors $4,006 $2,768 $2,834
32,883
kWh
$1,172
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $12,415 $13,077 $9,987
100,448
kWh
$2,428
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $32,326 $37,484 $26,003
301,694
kWh
$6,323
-
kW-mo/yr
- -
09 2.8114: Change rate schedules or other changes in utility service $11,683 $21,175 $11,683
-
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,611 $3,591 $1,016
11,794
kWh
$595
-
kW-mo/yr
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $8,262 $23,694 $6,234
72,331
kWh
$2,028
-
kW-mo/yr
- -
12 2.2111: Install steam trap $1,696 $4,340 - - $1,696
-
MMBtu
-
13 2.3113: Make ice during off peak hours for cooling $87,302 $912,000 $38,694
1,442,492
kWh
$48,608
-
kW-mo/yr
- -
14 3.1161: Eliminate/reduce an operation $34,191 $22,085 - - - $34,191
-
Tgal
TOTAL RECOMMENDED $319,902 $1,105,485 $156,264
2,030,097
kWh
$63,927
-
kW-mo/yr
$65,520
-
MMBtu
$34,191
-
Tgal
TOTAL IMPLEMENTED $196,713 $167,060 $117,570
587,605
kWh
$15,319
-
kW-mo/yr
$63,824
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs