ITAC Assessment: SF0325
ITAC logo
ITAC Assessment: SF0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product test system network
NAICS 541380: Testing Laboratories
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 450
Plant Area 120,764
ft2
Annual Production 130,000
units
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $703,065 7,746,417
kWh
Electricity Demand $169,232 13,310
kW-mo/yr
Natural Gas $6,275 581
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7124: Make a practice of turning off lights when not needed $3,756 - $3,756
39,959
kWh
- -
02 2.8114: Change rate schedules or other changes in utility service $25,307 $25,760 - - $25,307
03 2.8114: Change rate schedules or other changes in utility service $26,518 $25,760 - - $26,518
04 2.7241: Install outside air damper / economizer on hvac unit $11,700 $1,150 $11,700
124,478
kWh
- -
05 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $15,438 $8,485 $15,438
175,624
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $4,876 $22,500 $3,942
41,933
kWh
$934
-
kW-mo/yr
-
TOTAL RECOMMENDED $87,595 $83,655 $34,836
381,994
kWh
$934
-
kW-mo/yr
$51,825
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs