Assessment Year | 2006 |
---|---|
Principal Product | Municipal Waste Containers |
NAICS | 326140: Polystyrene Foam Product Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
45,000
ft2
|
Annual Production | 450,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $384,254 | 7,350,154 |
kWh
|
$0.052 |
Electricity Demand | $86,862 | 14,747 |
kW-mo/yr
|
$5.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $158,229 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,150 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7226: Use computer programs to optimize hvac performance | $8,385 | $4,000 |
$7,353
109,292
kWh
|
$1,032
-
kW-mo/yr
|
|
02 | 2.2511: Insulate bare equipment | $5,614 | $1,181 |
$5,614
83,316
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,718 | $3,434 |
$5,617
83,490
kWh
|
$1,101
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,432 | $8,974 |
$3,876
57,617
kWh
|
$556
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,123 | $5,355 |
$1,923
49,839
kWh
|
$200
-
kW-mo/yr
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $117,125 | $345,000 |
$111,892
1,663,133
kWh
|
$5,233
-
kW-mo/yr
|
|
07 | 2.7145: Install skylights | $13,832 | $47,430 |
$9,733
144,668
kWh
|
$4,099
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $158,229 | $415,374 |
$146,008
2,191,355
kWh
|
$12,221
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $11,150 | $12,408 |
$9,493
141,107
kWh
|
$1,657
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs