ITAC Assessment: SF0321
ITAC logo
ITAC Assessment: SF0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Pickled Peppers, Onions, and Olives
NAICS 311421: Fruit and Vegetable Canning
SIC 2054:
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 210,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 4,810
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,836 1,887,108
kWh
Electricity Demand $22,842 4,272
kW-mo/yr
Natural Gas $197,294 19,480
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,977

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,975 - - - $2,975
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $1,657 - - - $1,657
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,882 - $5,882
44,214
kWh
- -
04 2.2511: Insulate bare equipment $3,112 $863 - - $3,112
-
MMBtu
05 2.4239: Eliminate or reduce compressed air usage $3,189 $1,561 $2,795
20,335
kWh
$394
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,410 $2,345 $1,320
11,126
kWh
$90
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $554 $780 $391
9,287
kWh
$163
-
kW-mo/yr
-
08 2.4322: Use or replace with energy efficient substitutes $10,550 $25,410 $9,835
82,876
kWh
$715
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $4,170 $11,928 $2,456
59,903
kWh
$1,714
-
kW-mo/yr
-
TOTAL RECOMMENDED $33,499 $42,887 $22,679
227,741
kWh
$3,076
-
kW-mo/yr
$7,744
-
MMBtu
TOTAL IMPLEMENTED $28,977 $39,679 $21,359
216,615
kWh
$2,986
-
kW-mo/yr
$4,632
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs