Assessment Year | 2005 |
---|---|
Principal Product | Asphalt, & Concrete |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $10 M to 50M |
# of Employees | 41 |
Plant Area |
152,460
ft2
|
Annual Production | 11,000,000
lb
|
Production Hrs. Annual | 3,242
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $169,806 | 1,516,240 |
kWh
|
$0.11 |
Electricity Demand | $107,615 | 10,086 |
kW-mo/yr
|
$10.67 |
Natural Gas | $356,006 | 46,747 |
MMBtu
|
$7.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,924 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $794 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2 | $312 |
$2
24
kWh
|
- | - | - | |
02 | 2.2136: Install / repair insulation on steam lines | $2 | $206 | - | - | - |
$2
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $192 | $1,531 |
$1
18
kWh
|
$191
-
kW-mo/yr
|
- | - | |
04 | 2.2511: Insulate bare equipment | $16 | $8,242 | - | - | $16 | - | |
05 | 2.7134: Use photocell controls | $723 | $468 |
$616
6
kWh
|
$107
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $790 | $2,311 |
$1
17
kWh
|
$789
-
kW-mo/yr
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $600 | $1,082 |
$1
12
kWh
|
$599
-
kW-mo/yr
|
- | - | |
08 | 2.8114: Change rate schedules or other changes in utility service | $19 | $24 |
$19
-
kWh
|
- | - | - | |
09 | 2.7135: Install occupancy sensors | $1,186 | $2,422 |
$718
7
kWh
|
$468
-
kW-mo/yr
|
- | - | |
10 | 2.4133: Use most efficient type of electric motors | $6 | $16,353 |
$4
43
kWh
|
$2
-
kW-mo/yr
|
- | - | |
11 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $388 | $1,032 |
$269
2
kWh
|
$119
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $3,924 | $33,983 |
$1,631
129
kWh
|
$2,275
-
kW-mo/yr
|
$16 |
$2
-
MMBtu
|
||
TOTAL IMPLEMENTED | $794 | $2,829 |
$3
41
kWh
|
$789
-
kW-mo/yr
|
- |
$2
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs