ITAC Assessment: SF0315
ITAC logo
ITAC Assessment: SF0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Asphalt, & Concrete
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 41
Plant Area 152,460
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 3,242
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,806 1,516,240
kWh
Electricity Demand $107,615 10,086
kW-mo/yr
Natural Gas $356,006 46,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $794

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2 $312 $2
24
kWh
- - -
02 2.2136: Install / repair insulation on steam lines $2 $206 - - - $2
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $192 $1,531 $1
18
kWh
$191
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $16 $8,242 - - $16 -
05 2.7134: Use photocell controls $723 $468 $616
6
kWh
$107
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $790 $2,311 $1
17
kWh
$789
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $600 $1,082 $1
12
kWh
$599
-
kW-mo/yr
- -
08 2.8114: Change rate schedules or other changes in utility service $19 $24 $19
-
kWh
- - -
09 2.7135: Install occupancy sensors $1,186 $2,422 $718
7
kWh
$468
-
kW-mo/yr
- -
10 2.4133: Use most efficient type of electric motors $6 $16,353 $4
43
kWh
$2
-
kW-mo/yr
- -
11 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $388 $1,032 $269
2
kWh
$119
-
kW-mo/yr
- -
TOTAL RECOMMENDED $3,924 $33,983 $1,631
129
kWh
$2,275
-
kW-mo/yr
$16 $2
-
MMBtu
TOTAL IMPLEMENTED $794 $2,829 $3
41
kWh
$789
-
kW-mo/yr
- $2
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs