Assessment Year 2005
Principal Product Hot Dogs, Sauages
NAICS 311613: Rendering and Meat Byproduct Processing
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 48,000
ft2
Annual Production 8,125,000
lb
Production Hrs. Annual 2,756
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,700 2,122,310
kWh
Natural Gas $118,682 15,006
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,466 - - $4,466
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $914 - $914
13,550
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $819 - $819
6,791
kWh
-
04 2.2531: Re-size charging openings or add movable cover or door $11,812 $1,220 $11,812
96,519
kWh
-
05 2.7132: Install timers on light switches in little used areas $524 $492 $524
4,354
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,905 $2,148 $1,905
15,801
kWh
-
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $738 $1,086 - $738
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,296 $3,276 $1,296
10,748
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $7,705 $17,952 $7,705
63,923
kWh
-
TOTAL RECOMMENDED $30,179 $26,174 $24,975
211,686
kWh
$5,204
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs