ITAC Assessment: AS0118
ITAC logo
ITAC Assessment: AS0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Printed Checks
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 69
Plant Area 26,000
ft2
Annual Production 780,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,125 1,322,978
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,191 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,057

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7234: Use heat pump for space conditioning $10,233 $25,000 $10,233
111,665
kWh
02 2.7221: Lower temperature during the winter season and vice-versa $3,601 - $3,601
39,273
kWh
03 2.4133: Use most efficient type of electric motors $1,393 $1,097 $1,393
15,240
kWh
04 2.4314: Use synthetic lubricant $140 $318 $140
879
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,833 $3,220 $2,833
31,067
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $333 $40 $333
3,517
kWh
07 2.7135: Install occupancy sensors $1,870 $900 $1,870
20,516
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,788 $4,600 $2,788
30,481
kWh
TOTAL RECOMMENDED $23,191 $35,175 $23,191
252,638
kWh
TOTAL IMPLEMENTED $18,057 $33,760 $18,057
197,246
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs