ITAC Assessment: SF0299
ITAC logo
ITAC Assessment: SF0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Packaging Machinery
NAICS 333993: Packaging Machinery Manufacturing
SIC 3565: Packaging Machinery
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 122,850
ft2
Annual Production 280
pieces
Production Hrs. Annual 4,304
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,622 2,018,094
kWh
Natural Gas $24,459 3,140
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,905 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,880 $720 $5,880
47,487
kWh
- -
02 2.7134: Use photocell controls $2,789 $840 $2,325
18,782
kWh
$464
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,353 $2,547 $3,044
24,587
kWh
$309
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $2,135 $1,948 $1,933
15,616
kWh
$202
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $540 $880 $515
4,159
kWh
$25
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $1,229 $3,057 $869
7,019
kWh
$360
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $14,571 $74,180 $13,122
105,973
kWh
$1,449
-
kW-mo/yr
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,408 $8,000 - - $1,408
-
lb
TOTAL RECOMMENDED $31,905 $92,172 $27,688
223,623
kWh
$2,809
-
kW-mo/yr
$1,408
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs