ITAC Assessment: SF0298
ITAC logo
ITAC Assessment: SF0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Newspapers
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 84,000
ft2
Annual Production 74,000,000
pieces
Production Hrs. Annual 4,108
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $386,210 3,871,255
kWh
Electricity Demand $130,729 11,584
kW-mo/yr
Natural Gas $46,147 5,425
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $522 - $906
9,554
kWh
- $(-384.0) -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,943 $1,085 $1,647
18,190
kWh
$296
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $3,803 $2,432 $3,262
34,409
kWh
$541
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $61,229 $55,977 $52,687
555,825
kWh
$8,542
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,856 $24,003 $9,980
105,291
kWh
$6,876
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,297 $15,944 $3,196
33,710
kWh
$1,101
-
kW-mo/yr
- -
07 2.8114: Change rate schedules or other changes in utility service $43,910 $29,800 - - - $43,910
TOTAL RECOMMENDED $132,560 $129,241 $71,678
756,979
kWh
$17,356
-
kW-mo/yr
$(-384.0) $43,910
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs