ITAC Assessment: SF0293
ITAC logo
ITAC Assessment: SF0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Asphalt, Mineral Aggregate
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 1,000,000
ft2
Annual Production 3,500,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $516,369 5,139,099
kWh
Electricity Demand $243,418 22,978
kW-mo/yr
Natural Gas $660,260 114,803
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,714 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,658

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $5,290 $2,477 $4,154
41,343
kWh
$1,136
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $656 $592 $487
4,849
kWh
$169
-
kW-mo/yr
03 2.7134: Use photocell controls $3,487 $4,892 $2,674
26,614
kWh
$813
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,002 $7,873 $3,519
35,022
kWh
$1,483
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,148 $16,468 $7,140
71,061
kWh
$3,008
-
kW-mo/yr
06 2.7135: Install occupancy sensors $1,527 $3,458 $615
6,119
kWh
$912
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,866 $9,030 $2,722
27,090
kWh
$1,144
-
kW-mo/yr
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,654 $4,222 $1,219
12,129
kWh
$435
-
kW-mo/yr
09 2.4231: Reduce the pressure of compressed air to the minimum required $513 $2,222 $322
3,203
kWh
$191
-
kW-mo/yr
10 2.3212: Optimize plant power factor $5,824 $6,094 $5,824
-
kWh
-
11 2.8114: Change rate schedules or other changes in utility service $62,747 $62,300 $62,747
-
kWh
-
TOTAL RECOMMENDED $100,714 $119,628 $91,423
227,430
kWh
$9,291
-
kW-mo/yr
TOTAL IMPLEMENTED $5,658 $8,465 $4,006
39,871
kWh
$1,652
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs