Assessment Year | 2004 |
---|---|
Principal Product | Asphalt, Mineral Aggregate |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
1,000,000
ft2
|
Annual Production | 3,500,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $516,369 | 5,139,099 |
kWh
|
$0.10 |
Electricity Demand | $243,418 | 22,978 |
kW-mo/yr
|
$10.59 |
Natural Gas | $660,260 | 114,803 |
MMBtu
|
$5.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $100,714 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,658 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $5,290 | $2,477 |
$4,154
41,343
kWh
|
$1,136
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $656 | $592 |
$487
4,849
kWh
|
$169
-
kW-mo/yr
|
|
03 | 2.7134: Use photocell controls | $3,487 | $4,892 |
$2,674
26,614
kWh
|
$813
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,002 | $7,873 |
$3,519
35,022
kWh
|
$1,483
-
kW-mo/yr
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,148 | $16,468 |
$7,140
71,061
kWh
|
$3,008
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $1,527 | $3,458 |
$615
6,119
kWh
|
$912
-
kW-mo/yr
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,866 | $9,030 |
$2,722
27,090
kWh
|
$1,144
-
kW-mo/yr
|
|
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,654 | $4,222 |
$1,219
12,129
kWh
|
$435
-
kW-mo/yr
|
|
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $513 | $2,222 |
$322
3,203
kWh
|
$191
-
kW-mo/yr
|
|
10 | 2.3212: Optimize plant power factor | $5,824 | $6,094 |
$5,824
-
kWh
|
- | |
11 | 2.8114: Change rate schedules or other changes in utility service | $62,747 | $62,300 |
$62,747
-
kWh
|
- | |
TOTAL RECOMMENDED | $100,714 | $119,628 |
$91,423
227,430
kWh
|
$9,291
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $5,658 | $8,465 |
$4,006
39,871
kWh
|
$1,652
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs