Assessment Year | 2004 |
---|---|
Principal Product | Wine |
NAICS | 312130: Wineries |
SIC | 2084: Wines, Brandy, and Brandy Spirits |
Sales Range | $10 M to 50M |
# of Employees | 58 |
Plant Area |
28,000
ft2
|
Annual Production | 40,000
lb
|
Production Hrs. Annual | 3,680
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,373 | 656,252 |
kWh
|
$0.15 |
Electricity Demand | $7,344 | 1,635 |
kW-mo/yr
|
$4.49 |
Natural Gas | $15,719 | 1,398 |
MMBtu
|
$11.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,051 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $334 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $220 | $204 |
$192
1,342
kWh
|
$28
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,407 | $1,649 |
$2,407
13,087
kWh
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $481 | $380 |
$397
2,763
kWh
|
$84
-
kW-mo/yr
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $842 | $1,252 |
$1,124
7,862
kWh
|
$121
-
kW-mo/yr
|
$(-403.0)
-
MMBtu
|
- | |
05 | 2.7135: Install occupancy sensors | $1,425 | $2,689 |
$1,230
8,605
kWh
|
$195
-
kW-mo/yr
|
- | - | |
06 | 2.2511: Insulate bare equipment | $334 | $1,065 |
$334
1,989
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $283 | $925 |
$283
1,536
kWh
|
- | - | - | |
08 | 2.7145: Install skylights | $954 | $5,520 |
$954
5,186
kWh
|
- | - | - | |
09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,105 | $10,964 | - | - | - |
$6,105
-
lb
|
|
TOTAL RECOMMENDED | $13,051 | $24,648 |
$6,921
42,370
kWh
|
$428
-
kW-mo/yr
|
$(-403.0)
-
MMBtu
|
$6,105
-
lb
|
||
TOTAL IMPLEMENTED | $334 | $1,065 |
$334
1,989
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs