ITAC Assessment: SF0284
ITAC logo
ITAC Assessment: SF0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Formaldehyde, Resins, Wax Emulsion
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area 1,000,000
ft2
Annual Production 260,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $447,719 8,043,030
kWh
Electricity Demand $98,572 12,317
kW-mo/yr
Natural Gas $281,741 42,495
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,252 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
01 2.4131: Size electric motors for peak operating efficiency $46,318 $4,640 $39,439
508,435
kWh
$6,879
-
kW-mo/yr
- - -
02 2.2442: Preheat combustion air with waste heat $10,601 $3,625 - - $10,601
-
MMBtu
- -
03 2.4131: Size electric motors for peak operating efficiency $6,202 $2,331 $5,274
68,002
kWh
$928
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,933 $12,763 $15,501
199,828
kWh
$4,432
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $5,065 $3,065 - - $5,065
-
MMBtu
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,841 $8,312 $11,000
141,800
kWh
$1,841
-
kW-mo/yr
- - -
07 2.2441: Preheat boiler makeup water with waste process heat $39,674 $43,664 - - $39,674
-
MMBtu
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,661 $1,900 $1,406
18,117
kWh
$255
-
kW-mo/yr
- - -
09 2.7135: Install occupancy sensors $554 $1,152 $325
4,192
kWh
$229
-
kW-mo/yr
- - -
10 2.2414: Use waste heat from hot flue gases to preheat $15,103 $50,000 - - $15,103
-
MMBtu
- -
11 3.4154: Eliminate leaks in water lines and valves $13,300 $3,000 - - - $1,289
-
Tgal
$12,011
-
Tgal
TOTAL RECOMMENDED $171,252 $134,452 $72,945
940,374
kWh
$14,564
-
kW-mo/yr
$70,443
-
MMBtu
$1,289
-
Tgal
$12,011
-
Tgal
TOTAL IMPLEMENTED $39,435 $18,094 $20,775
267,830
kWh
$5,360
-
kW-mo/yr
- $1,289
-
Tgal
$12,011
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs