Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Heat Treated Parts
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area 25,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,996 127,642
kWh
Electricity Demand $38,524 7,466
kW-mo/yr
Natural Gas $38,524 29,736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,219

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $699 - $975
9,365
kWh
- $(-276.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,368 $11,810 $11,368
109,196
kWh
- -
03 2.7135: Install occupancy sensors $1,168 $1,200 $1,168
11,222
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,520 $13,375 $3,520
33,806
kWh
- -
05 2.3212: Optimize plant power factor $1,079 $1,376 - $1,079 -
TOTAL RECOMMENDED $17,834 $27,761 $17,031
163,589
kWh
$1,079 $(-276.0)
TOTAL IMPLEMENTED $4,219 $13,375 $4,495
43,171
kWh
- $(-276.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs