| Assessment Year | 2004 |
|---|---|
| Principal Product | Dairy Product |
| NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
| SIC | 2026: Fluid Milk |
| Sales Range | $100 M to 500M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 18,200,000
Tgal
|
| Production Hrs. Annual | 4,200
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $724,659 | 9,844,053 |
kWh
|
$0.074 |
| Electricity Demand | $143,766 | 30,237 |
kW-mo/yr
|
$4.75 |
| Natural Gas | $1,022,553 | 85,928 |
MMBtu
|
$11.90 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $96,493 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $57,709 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4131: Size electric motors for peak operating efficiency | $2,063 | $739 |
$1,548
21,034
kWh
|
$515
-
kW-mo/yr
|
- | - | |
| 02 | 2.2441: Preheat boiler makeup water with waste process heat | $49,562 | $39,000 | - | - |
$49,562
-
MMBtu
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $6,238 | - |
$5,602
76,105
kWh
|
$636
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,909 | $3,688 |
$1,605
21,810
kWh
|
$304
-
kW-mo/yr
|
- | - | |
| 05 | 2.2514: Cover open tanks | $715 | $1,469 | - | - |
$715
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,604 | $12,835 |
$2,954
40,137
kWh
|
$650
-
kW-mo/yr
|
- | - | |
| 07 | 2.7135: Install occupancy sensors | $1,197 | $4,096 |
$935
12,705
kWh
|
$262
-
kW-mo/yr
|
- | - | |
| 08 | 2.7134: Use photocell controls | $613 | $2,971 |
$524
7,118
kWh
|
$89
-
kW-mo/yr
|
- | - | |
| 09 | 2.2612: Use cooling tower water instead of refrigeration | $30,592 | $34,814 | - | - | - |
$30,592
-
Tgal
|
|
| TOTAL RECOMMENDED | $96,493 | $99,612 |
$13,168
178,909
kWh
|
$2,456
-
kW-mo/yr
|
$50,277
-
MMBtu
|
$30,592
-
Tgal
|
||
| TOTAL IMPLEMENTED | $57,709 | $42,688 |
$7,207
97,915
kWh
|
$940
-
kW-mo/yr
|
$49,562
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs